X-Axis EChain carton
Opening the shipping carton
Parts included in the carton
Closeup of hardware parts
Area of PRS96 to mount EChain
PRS96 Control Box
View of X-Axis before installation
EChain bracket
Alignment of Ball & Spring Pivot Inserts
Echain parts
Trough bracket on center leg
Trough bracket on end leg
View of both trough brackets
Inner trough installed
View of inner trough
Outer trough installed
View of both trough sides
The Upper X-Chain Bracket installed
Echain attached to upper bracket
Echain opened to insert cables
Threading cables into Echain
Cables in the Echain
Closing up Echain
Echain fully extended
Echain fully contracted
Re-zeroing X,Y, and Z axes with a SuperZero Fixture